• Project label
  • campaign promise for release
    • Project label
    • Project label
  • These MUST ship on the dev board. ETA June 2018.
    • Project label
  • These make the phone minimally useable. ETA January 2019. They are required to make Phase 2 items possible.
    • Project label
  • These MUST ship on the phone release. Based on the promises we made. ETA January 2019.
    • Project label
  • These MAY ship on the phone release. ETA January 2019.
    • Project label
  • These MUST or SHOULD be complete at some point.
    • Project label
  • Indicates that the issue is blocked by something that should be indicated in the comments.
    • Group label
    • Project label
    • Project label
    • Project label
    • Project label
    • Project label
  • makes unrelated software on the system (or the whole system) break, or causes serious data loss, or introduces a security hole on systems where you install the package
    • Group label
  • Issues relating to the Librem 5 development kit
    • Group label
  • A collection of features.
    • Group label
    • Project label
  • A collection of issues.
    • Group label
  • the issue has been fixed upstream but the fix has not trickled down to the Librem 5 project yet
    • Group label