1. 19 Jul, 2018 7 commits
  2. 18 Jul, 2018 9 commits
  3. 17 Jul, 2018 2 commits
  4. 16 Jul, 2018 2 commits
  5. 14 Jul, 2018 2 commits
  6. 11 Jul, 2018 4 commits
  7. 10 Jul, 2018 1 commit
    • Eric Kuzmenko's avatar
      Route VBUS to the charge controller, move the bypass cap next to the charge... · 58739bbe
      Eric Kuzmenko authored
      Route VBUS to the charge controller, move the bypass cap next to the charge controller's VBUS pin (1) in order to make room for the via array, ensure that all of the high-current paths have sufficient copper and that the ampacity of the via arrays meets the requirement, the temperature rise should not exceed ~25C (50C degrees if ambient is 25C) at any copper layer when the PTCs' trip current is reached
      58739bbe
  8. 09 Jul, 2018 3 commits
  9. 07 Jul, 2018 1 commit
  10. 06 Jul, 2018 1 commit
  11. 05 Jul, 2018 4 commits
  12. 04 Jul, 2018 3 commits
  13. 03 Jul, 2018 1 commit
    • Eric Kuzmenko's avatar
      Move the VBUS TVS diode and bypass caps and place copper pour on the... · e33ad1fb
      Eric Kuzmenko authored
      Move the VBUS TVS diode and bypass caps and place copper pour on the respective pad areas, the VBUS rail has a 6mm wide fill zone in order to properly handle ~4.3A with a <10degreeC temperature rise (should also do this when bring VBUS to the charge controller), make the In4.Cu layer a solid ground layer
      e33ad1fb